Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
foundation:gsoc_tahir [2010/07/07 19:47]
amertahir
foundation:gsoc_tahir [2010/12/18 17:35] (current)
Line 60: Line 60:
 |Modify the existing sync process to work with S3XRC import/export instead of working directly with DB tables (and records)|Prototype demo of the S3XRC powered sync system|06/09/2010|Completed| |Modify the existing sync process to work with S3XRC import/export instead of working directly with DB tables (and records)|Prototype demo of the S3XRC powered sync system|06/09/2010|Completed|
 |Incorporate automatic conflict resolution policies in the sync system|Demo of a working (possibly buggy) implementation|06/20/2010|Completed| |Incorporate automatic conflict resolution policies in the sync system|Demo of a working (possibly buggy) implementation|06/20/2010|Completed|
-|Finalizing conflict resolution policies after bug fixing and preparation of test scenarios to verify it|Demo of the sync system with conflict resolution including Test Plan and Test Report that would be approved after review by the mentor(s)|06/29/2010|Incomplete+|Finalizing conflict resolution policies after bug fixing and preparation of test scenarios to verify it|Demo of the sync system with conflict resolution including testing that would be approved after review by the mentor(s)|06/29/2010|Completed
-|Finalize the sync system with bug fixing and changes suggested by the mentor(s) along with testing of the entire system|Demo of the sync system with testing procedures defined (Test Plan); approval by the mentor(s)|07/11/2010|Incomplete|+|Finalize the sync system with bug fixing and changes suggested by the mentor(s) along with testing of the entire system|Demo of the sync system with testing procedures defined (Test Plan); approval by the mentor(s)|07/11/2010|Completed|
  
 \\ \\
Line 67: Line 67:
 ^Final Evaluation Milestones: 13 July - 9 August^^^^ ^Final Evaluation Milestones: 13 July - 9 August^^^^
 ^Goal^Measure^Due Date^Status^ ^Goal^Measure^Due Date^Status^
-|Implement the Offline Sync (USB flash syncfunctionality in the sync system|Prototype demo of the offline sync (possibly buggy)|07/18/2010|Incomplete+|Implementing Sync Scheduler to allow scheduling of multiple sync operations (jobs) (possibly buggy)|07/18/2010|Completed - late
-|Incorporating Beacon service into the sync implementation to work along with ZeroConf daemon|Demo of a working (possibly buggy) implementation of sync that utilizes both Beacon service and ZeroConf along with approval by the mentor(s)|07/20/2010|Incomplete+|Finalizing Sync scheduler, testing with the integrated system|07/20/2010|Completed
-|Implementation of multiple sync pools with automatic discovery of sync partners using Beacon service and ZeroConf|Demo of the working system along with approval from the mentor(s)|08/01/2010|Incomplete| +|Implement the Offline Sync (USB flash sync) functionality in the sync system|Prototype demo of the offline sync|08/01/2010|Incomplete| 
-|Bug fixing of the offline sync and other components of the sync system|Progress report submitted to the mentor(s), then reviewed and approved by them|08/05/2010|Incomplete+|Bug fixing of the components of the sync system|Progress report submitted to the mentor(s), then reviewed and approved by them|08/05/2010|Completed
-|Final integration of the entire system, preparing it for the demo|Demo of the entire sync system, approval by the mentor(s)|08/09/2010|Incomplete|+|Final integration of the entire system, preparing it for the demo|Demo of the entire sync system, approval by the mentor(s)|08/09/2010|In progress|

QR Code
QR Code foundation:gsoc_tahir (generated for current page)